Showing 1 - 20 of 2563 Bridges
# | Bridge Category | Bridge Number | Bridge Name | Bridge Stucture Type | Longest Span Length | Age of Bridge (Yrs) | IR Zone | Division | Sub Div | Bridge Type |
1 | Maj | 695 | Mixed Type | Mixed Type | - | - | ECR | Pt. Deen Dayal Upadhyaya | AEN/II/DDU | Waterway |
2 | Maj | 683 | - | Steel Girder | - | - | SWR | Mysore | ADEN/MYS | Waterway |
3 | Imp | 89 | - | Steel Girder | - | - | ECR | Samastipur | ADEN/NKE | - |
4 | Maj | 506 | Ghoga Nadi | Slab | - | - | Not Available | - | - | Waterway |
5 | Maj | 79 | Barsati Nalah | Steel Girder | - | - | NR | Moradabad | ADEN/NBD | Waterway |
6 | Maj | 416 | Kalyani River | Steel Girder | - | - | NR | Lucknow | ADEN/II/LKO | Waterway |
7 | Maj | 507 | Katika Jan | Slab | - | - | Not Available | - | - | Waterway |
8 | Maj | 440 | Jamuriya Nallah | Steel Girder | - | - | NR | Lucknow | ADEN/II/LKO | Waterway |
9 | Maj | 16 | Dadar | Steel Girder | - | - | NR | Moradabad | ADEN/NBD | Waterway |
10 | Maj | 45 | Chaliya Nadi | Slab | - | - | NR | Moradabad | ADEN/NBD | Waterway |
11 | Maj | 69 | Dokvaru | Steel Girder | - | - | WR | Mumbai | ADEN(N)BL | Waterway |
12 | Maj | 64 | Deshbala Nala | Steel Girder | - | - | NR | Moradabad | ADEN/NBD | Waterway |
13 | Maj | 789 | - | Slab | - | - | NWR | Ajmer | ADEN-ABR | Waterway |
14 | Maj | 505 | Flood Opening | Slab | - | - | ECR | Pt. Deen Dayal Upadhyaya | ADENDOS | Waterway |
15 | Maj | 320 | Sai River | Steel Girder | - | - | NR | Lucknow | ADEN/PBH | Waterway |
16 | Maj | 24 | - | RCC/PSC Girder | - | - | ECR | Sonpur | ADEN/E/BJU | RUB |
17 | Imp | 83 | Vasai Creek | PSC Box | 45.7 | - | WR | - | | - |
18 | Imp | 83 | Vasai Creek | PSC Box | 45.7 | - | WR | Mumbai | | - |
19 | Maj | 6 | Na | Slab | - | - | Not Available | - | - | Waterway |
20 | Imp | 151 | - | RCC/PSC Girder | - | - | NER | Lucknow Jn. | ADEN/N/GD | - |